Design works of the Pre-design stage of “Reconstruction of the site located at: Kiyv region, Ivankivsky district, Chernobyl city, 54/1 Kirova str. with the placement of installations for the thermal processing of hazardous waste and the implementation of waste management operations. ”
Technological solutions are developed on the basis of the basic project of SEILER Höchsttemperatur Trennanlagen GmbH “SEMI MOBILE WASTE INCINERATOR PLANT”.
The aim of the project is to create a modern complex for transportation, thermal neutralization and processing of waste, including toxic, plant protection products, chlorine-containing waste. The capacity of the enterprise is 960 kg/h (6912 tons per year) of waste.